Image Gallery

Operations

SMP102 - Rig up
SMP102 - Rig up
SMP102 - Rig up
SMP102 - Rig up
SMP102 - Rig up (mast fully extended)
SMP102 - Rig up (mast fully extended)
Moving the mast into location
Moving the mast into location
Spud ceremony for TLP-103
Spud ceremony for TLP-103
Moving the rig into location (1)
Moving the rig into location (1)
Moving the rig into location (2)
Moving the rig into location (2)
Raising the mast
Raising the mast
Preparing to hammer
Preparing to hammer
Hammering the conductor
Hammering the conductor
Newly extended drilling pad
Newly extended drilling pad
Extending the drill pad (1)
Extending the drill pad (1)
Extending the drill pad (2)
Extending the drill pad (2)
TLP-103C surface location
TLP-103C surface location
Community project - Ngoyo Health Clinic in Pointe Noire
Community project - Ngoyo Health Clinic in Pointe Noire
SMP102 rig mobilisation by road
SMP102 rig mobilisation by road
SMP102 rig mobilisation (1)
SMP102 rig mobilisation (1)
SMP102 rig mobilisation (2)
SMP102 rig mobilisation (2)
Shore line
Shore line
Aerial view of site
Aerial view of site
back to top